ms project 入门_Microsoft Project 2010入门

2023-10-30

ms project 入门

Would you like to keep your projects on track and keep track of how time and resources are used?  Let’s take a look at Microsoft Project 2010 and how it can help you stay on top of your projects.

您想保持项目进度并了解如何使用时间和资源吗? 让我们看一下Microsoft Project 2010以及它如何帮助您掌握项目的顶部。

Microsoft Project 2010 is the latest version of Project, a companion project management application for Microsoft Office.  This version includes a wide range of changes, including the new ribbon interface.  Microsoft Project integrates with all the other Office application you regularly use,

Microsoft Project 2010是Project的最新版本,Project是用于Microsoft Office的配套项目管理应用程序。 此版本包括广泛的更改,包括新的功能区界面。 Microsoft Project与您经常使用的所有其他Office应用程序集成在一起,

设置项目2010 (Setting Up Project 2010)

First, you’ll need to install Project 2010 on your computer.  If you haven’t purchased Project, you can try out a free 60 day trial from the link below.  The installer works just like the Office 2010 installer, so if you’ve already installed Office 2010 you’ll know what to expect.  Enter your product key to get started, then install as normal.

首先,您需要在计算机上安装Project 2010。 如果您尚未购买Project,则可以从下面的链接中免费试用60天。 该安装程序的工作方式与Office 2010安装程序的工作方式相同,因此,如果您已经安装了Office 2010,您将知道会发生什么。 输入产品密钥开始使用,然后按常规安装。

Now you’re ready to get started managing your projects in Microsoft Project 2010.

现在,您可以开始在Microsoft Project 2010中管理项目了。

在Microsoft Project中管理您的项目 (Manage Your Projects in Microsoft Project)

When you first start Project, you’ll notice that it’s immediately ready for you to start entering tasks.  Simply enter a task name, duration, start and finish times, and any other details you need.  Your new tasks will show up automatically in the Gantt chart on the right, where you can drag the tasks to change the start and finish times.

首次启动Project时,您会注意到它已经可以立即开始输入任务。 只需输入任务名称,持续时间,开始和完成时间以及您需要的其他任何详细信息。 您的新任务将自动显示在右侧的甘特图中,您可以在其中拖动任务以更改开始和结束时间。

You can make an existing tasks a sub-task easily.  Once you’ve entered the sub-task, simply hover over the task and your mouse will turn into an arrow.  Now drag the bar right or left to make the task a sub-task or remove it from being a sub-task.

您可以轻松地使现有任务成为子任务。 输入子任务后,只需将鼠标悬停在任务上,鼠标就会变成箭头。 现在,向右或向左拖动栏以使该任务成为子任务,或将其从子任务中删除。

It includes a wide variety of fields you can add to tasks so you can keep track of all important aspects.  Choose the things most important for this project.

它包括可以添加到任务中的各种字段,因此您可以跟踪所有重要方面。 选择对该项目最重要的事情。

Microsoft Project is designed to help you manage the whole team’s time, so you’ll want to add Resources, or the people involved in the project, to your new project.  You can quickly add new people to the project by entering their names in the Resource field.  Once you’ve entered different team members on various tasks, you’ll be able to select one from the drop-down menu.

Microsoft Project旨在帮助您管理整个团队的时间,因此您需要向新项目中添加“资源”或参与项目的人员。 您可以通过在“资源”字段中输入新人的姓名来快速将新人添加到项目中。 在不同的任务中输入了不同的团队成员后,就可以从下拉菜单中选择一个。

Now, select the Resources tab on the top ribbon, and click the Details button.  This will open a details pane about your resources, where you can add the individual’s rate per hour, available time to work on the project, and more.

现在,选择顶部功能区上的“资源”选项卡,然后单击“详细信息”按钮。 这将打开一个有关资源的详细信息窗格,您可以在其中添加个人每小时的费率,可用于项目工作的时间等。

The Resource tab also lets you add resources, including material and cost resources.  You can also import people into your project from your Active Directory or Address Book.

资源选项卡还允许您添加资源,包括物料和成本资源。 您也可以从Active Directory或通讯录中将人员导入项目中。

Once you’ve added everyone’s rates and available times, you may notice some conflicts highlighted in red on your tasks.  Right-click on the task to see some solutions, or select Fix in Task Inspector to get more insight on how to solve the problems.

添加了每个人的费率和可用时间后,您可能会注意到一些冲突以红色突出显示在您的任务上。 右键单击任务以查看一些解决方案,或者在Task Inspector中选择“修复”以获取有关如何解决问题的更多见解。

The Task Inspector helps you see what conflicts the employee or other resource may have, and will give you options to extend the deadline, add more people on the task, and more.  These features can help you manage your company without accidently overscheduling anyone.

任务检查器可以帮助您查看员工或其他资源可能存在的冲突,并为您提供选择以延长期限,在任务上添加更多人员等。 这些功能可以帮助您管理公司,而不会意外地安排任何人。

As your projects grow more complex, you may find a different way to view your project would be helpful.  Simply click the chart button on the far left of the ribbon, and select from the wide range of built-in views, sheets, and reports you can use for your project.

随着项目变得越来越复杂,您可能会发现以另一种方式查看项目会有所帮助。 只需单击功能区最左侧的图表按钮,然后从可用于项目的大量内置视图,图纸和报告中进行选择。

Large projects can become unwieldy on their own, so at some point, you’ll need to decide to split tasks into new projects.  Microsoft Project lets you keep everything together, still, even if you need to move it into a new project file.  From the Project tab, you can link various projects together or create a subproject to keep everything in order.

大型项目可能会变得笨拙,因此在某个时候,您需要决定将任务拆分为新项目。 Microsoft Project使您可以将所有内容保持在一起,即使您需要将其移动到新的项目文件中。 在“项目”选项卡中,您可以将各种项目链接在一起,也可以创建一个子项目以使所有内容井井有条。

You can also fully customize how your project looks from the ribbon, complete with various graphics styles for your Gantt charts.

您还可以完全自定义项目从功能区的外观,并为甘特图提供各种图形样式。

Project offers a wide range of reports you can generate about your projects, including costs, workload, and more.  Note that you’ll have to enter all the available information in your tasks to make sure your reports are as accurate as possible.

Project提供了您可以生成的有关项目的各种报告,包括成本,工作量等。 请注意,您必须在任务中输入所有可用信息,以确保报告尽可能准确。

Then, you can share your project details with your team in PDF format so everyone can use it whether they have Project or not.

然后,您可以与您的团队共享PDF格式的项目详细信息,这样无论是否拥有Project,每个人都可以使用它。

了解有关项目的更多信息 (Learning More About Project)

Project can make it easier to manage your projects, but it can appear daunting at first.  Thankfully, Microsoft offers several resources that can help you get up to speed quickly and easily.  First, the built-in Help app contains some great information into how to put project management tools to use, including some basics of how project management itself works.

项目可以使您更轻松地管理项目,但是乍一看可能令人生畏。 值得庆幸的是,Microsoft提供了多种资源,可以帮助您快速轻松地掌握速度。 首先,内置的“帮助”应用程序包含一些有关如何使用项目管理工具的重要信息,包括有关项目管理本身工作方式的一些基础知识。

Then, you can download a quick reference guide (link below) that contains detailed steps to help you make useful Project files to make you and your team more efficient.

然后,您可以下载快速参考指南(下面的链接),其中包含详细步骤,以帮助您制作有用的Project文件,以使您和您的团队更加高效。

There are additionally many Project templates you can quickly download and look at to help you get a feel for how you can put Project to use.  Simply open the File tab, select New, then browse the available Office.com templates.  You’ll generally make the best plans for your own projects if you create your own new Project files, but these can give you ideas and let you see how you might break your project down into useful parts.

另外,您还可以快速下载并查看许多Project模板,以帮助您了解如何使用Project。 只需打开“文件”选项卡,选择“新建” ,然后浏览可用的Office.com模板。 如果您创建自己的新Project文件,通常会为自己的项目制定最佳计划,但是这些计划可以为您提供想法,并让您了解如何将项目分解为有用的部分。

These resources should help you manage your projects better than ever in Project 2010.  Microsoft Project includes many features designed to help you efficiently manage your whole team’s time.  If you take the time to setup up tasks and plan appropriately, it can be a great help at planning new appointments and keeping everyone productive.

这些资源将帮助您比Project 2010更好地管理项目。MicrosoftProject包含许多旨在帮助您有效管理整个团队时间的功能。 如果您花时间设置任务并进行适当的计划,则在计划新约会并保持每个人的工作效率方面都可以提供很大的帮助。

Learn More About Microsoft Project 2010

了解有关Microsoft Project 2010的更多信息

Download a free 60 day trial of Project Professional 2010

下载Project Professional 2010的60天免费试用版

Download a Quick Reference Guide to get started with Project easily

下载快速参考指南,轻松开始Project

翻译自: https://www.howtogeek.com/howto/31370/getting-started-with-microsoft-project-2010/

ms project 入门

本文内容由网友自发贡献,版权归原作者所有,本站不承担相应法律责任。如您发现有涉嫌抄袭侵权的内容,请联系:hwhale#tublm.com(使用前将#替换为@)

ms project 入门_Microsoft Project 2010入门 的相关文章

随机推荐

  • OpenSSL之EVP(一)——数据结构及源码结构介绍

    EVP简介 Openssl EVP提供了丰富的密码学中的各种函数 Openssl 中实现了各种对称算法 摘要算法以及签名 验签算法 EVP 函数将这些具体的算法进行了封装 EVP 主要封装了如下功能函数 1 实现了 base64 编解码 B
  • 新浪期货数据接口

    附注 对于期货数据 一直在寻找互联网上能够获得的比较好的数据源 最近发现了 新浪期货 的数据源 可以提供一分钟的期货K线数据 http hq sinajs cn list TICKER 对于国内期货连续 Ticker为正常Ticker加个0
  • Deep Residual Network

    先阅读者两篇写的比较好的博客 https blog csdn net dulingtingzi article details 79870486 https blog csdn net qq 31050167 article details
  • 高德地图绘制标记点,点击弹出弹框进入第三方地图软件

    需求 根据经纬度绘制标记点 点击标记点弹出弹框和底部按钮 点击顶部弹框进入二级界面 点击底部按钮弹出第三方地图软件选择页 实现跨进程跳转 效果图 项目是公司项目 只放出重要部分代码 final Marker marker1 aMap add
  • 计算机图形学入门(八)-着色(插值、高级纹理映射)

    目录 重心坐标 应用纹理 1 纹理分辨率很小 2 纹理分辨率过大 纹理的应用 颜色 环境贴图 Environment Map 法线贴图 凹凸贴图 位移贴图 三维纹理和三维噪声 着色信息的记录 学习视频来源 GAMES101 现代计算机图形学
  • 【操作系统】进程间通信的五种方式

    引言 1 进程对白 管道 记名管道 套接字 1 管道 2 虫洞 套接字 3 信号 4 信号旗语 信号量 5 进程拥抱 共享内存 引言 进程作为人类的发明 自然免不了脱离人类的习性 也有通信需求 如果进程之间不进行任何通信 那么进程所能完成的
  • 关于你STM32F407片内FLASH擦除失败的问题

    近日 发现STM32F407片内FLASH在写入数据时某些情况下会出现扇区擦除不成功的情况 使用正点原子的代码测试也出一样的情况 网上搜索也没找到较为理想的答案 只有一篇文章遇到同样问题 也是使用了一个不太可靠的办法 但是好在可以解决问题
  • DM8无图形界面安装与使用

    本机实验环境 centos7 9 参考文档 数据库安装 达梦云适配中心文档 dameng com https eco dameng com docs zh cn start install dm linux prepare html 1 系
  • “红山开源”创新论坛

    ChinaOSC 2022 红山开源 创新论坛将于2022年8月20日14 00 17 00在陕西省西安高新国际会议中心召开 红山开源 创新论坛重点聚焦战略科技领域相关需求 邀请知名院士和专家共同探讨战略科研任务开源众创组织模式和项目孵化方
  • 部署tomcat时出现No artifacts marked for deployment

    这种错误主要是因为没有设置导出包 解决方法 File gt Project Structure gt Artifacts 然后点击ok 然后记得apply ok 此时再回到问题所在 点击Fix即可 或者如下
  • JAVA中的正则表达式

    一 正则表达式的构成 1 字符类 abc a b c abc 任何字符 除了a b c a zA Z a到z或A到Z 两头的字母包含在内 范围 2 预定义字符类 任何字符 d 数字 0 9 D 非数字 0 9 s 空白字符 t n x0B
  • Python爬虫JS解密详解,学会直接破解80%的网站(二)!!!

    文章目录 前言 1 网页查看 2 JS解密过程 细心看哦 3 解密答案 完整代码 CSDN独家福利降临 Python爬虫JS解密详解 学会直接破解80 的网站 25个爬虫项目宝藏教程 你值得拥有 前言 Glidedsky这关的JS解密不同于
  • js rsa加密_Python实现RSA(jsencrypt)加密的两种方式

    RSA是一种常用加密算法 经常用在前端向后端传送密码的时候 一 通过运行rsa js文件加密 rsa js文件下载地址 https gitee com youchuanming rsa jsencrypt import urllib pur
  • 常见排序算法的js实现

    常见排序算法的js实现 冒泡排序 选择排序
  • git 笔记/常见命令/as的fetch,pull ,update project的区别/标签管理

    Git概念汇总 头 HEAD 头 HEAD HEAD类似一个 指针 指向当前活动 分支 的 最新版本 工作区 Workspace 就是在电脑里能看到的项目代码库目录 是我们搬砖的地方 在这里我们可以新增文件 修改文件内容 或删除文件 此时的
  • Java线程的5种状态及状态之间转换

    Java中的线程的生命周期大体可分为5种状态 1 新建 NEW 新创建了一个线程对象 2 可运行 RUNNABLE 线程对象创建后 其他线程 比如main线程 调用了该对象的start 方法 该状态的线程位于可运行线程池中 等待被线程调度选
  • 电子设计竞赛应该如何准备?

    全国大学生电子设计竞赛 当初我听到这个比赛的时候心中还有些胆怯 毕竟它含金量确实高 而且要想在全国去的好的名次 也确实不是一件容易的事情 但经过我大二一年的准备 我还是在自己的努力下 拿到了全国二等奖 现在都还清楚地记得但是得知我们的团队获
  • ChatGPT对高校人才培养模式的挑战与应对策略思考

    酷吗 输入指令后直接就能生成一大串代码 即使不懂相关技术也能玩转编程 这就是ChatGPT赋予你的 新能力 除了写代码 ChatGPT还能帮你执行各种五花八门的任务 AI工具如ChatGPT在行业中的广泛应用对于行业的人才结构和能力要求产生
  • 部署Vista – 第18部分:管理Windows部署服务

    原创作品 允许转载 转载时请务必以超链接形式标明文章 原始出处 作者信息和本声明 否则将追究法律责任 http iwantfly blog 51cto com 1048259 240872 介绍如何管理和配置Windows部署服务服务器 本
  • ms project 入门_Microsoft Project 2010入门

    ms project 入门 Would you like to keep your projects on track and keep track of how time and resources are used Let s take